新闻动态

首页 > 新闻动态
电缆槽模具生产工艺发生了很大的转变
发布人:管理员   发布时间:2020-8-1

电缆槽模具采用****原料注塑而成,采用注塑机注塑成型,需要一套相配套的注塑钢模具,注塑钢模具的尺寸决定了模具的尺寸

The well cover mould is made of high quality PP raw material by injection moulding, and is moulded by injection moulding machine. A set of matching injection steel mould is needed. The size of the injection steel mould determines the size of the mould.


根据模具的大小尺寸不同,需要的注塑设备也有大小之分,根据水泥电缆槽的尺寸,重量决定采用多大的注塑设备生产制作

According to the size and size of the mould, the injection equipment needed can also be divided into different sizes. According to the size and weight of the cement well cover, the size of the injection equipment is decided.

                                  


在使用过程中,可以就地取材,可降低很多成本,以水泥、沙子、尾矿砂、石子等为主原料,制成的外观看着很像天然的石材

In the use process, it can be used locally, which can reduce a lot of costs. The striped brick made of cement, sand, tailings sand, stone and other raw materials looks like natural stone.


而实际使用的成本只占三分之一,价格占很大优势。不仅制作成的条纹砖强度高,耐磨性能好,高度防滑,制作电缆槽的模具质量超级耐用,耐磨性能也很好,配合脱模剂可方便脱模。

However, the actual cost of use only accounts for one third, and the price has a great advantage. Not only the Striped brick has high strength, good wear resistance and high skid resistance, but also the mould for making well cover has super durability and good wear resistance. It can be easily demoulded with demoulding agent.

上一篇:没有了